KEBIR GAFSA DAM : DETAILED ENGINEERING STUDY AND SUPERVISION

Country: TUNISIA   Location Within Country : CITY OF GAFSA

Duration of Assignment : 36 months

Name of Customer: General Directorate of Dams- Ministry of Agricultures and hydraulics resources

Narrative Description of Project :

Phase 1: Expertise, revision and validation of preliminary studies, preparation of implementation plans, preparation of technical specification files and tender documents.

Phase 2: supervision of works.

Phase 3: Technical assistance to commissioning works.

Description of Actual Services Provided by Your staff :

By CONCEPT:

  • Review of previous studies;

  • Establishment of a program for additional geotechnical work;

  • Definition and implementation of topographical surveys;

  • Hydrological studies, flood management and regulation;

  • geological Surveys and search for materials to borrow;

    By Stucky S.A & Stucky Enhyd :

  • Conception and design of all structures.

  • Ongoing: Control and supervision of works since July 2012

Autres Articles