Verify the design and sizing studies of the dam and the PS1 pump station with its transfer line.
Design and sizing of the new pumping station PS0 and its transfer pipe;
Design and sizing of the 4 transfer pipes from the dam for a total flow of 13.2m3/s;
Update the DTP reports, the CAD and reproduce the execution file, taking into account the new terms of reference and the changes planned on the initial design (06 months)
Carry out the mission of control and permanent follow-up of the site (45 months).
Assist the customer during the warranty period (12 months).