  • Duration of the mission: Studies : 5 months Works supervision : 12 months
  • Name of the Client : MINISTRY OF PUBLIC WORKS TRANSPORT AND COMMUNICATIONS "MTPTC" -DIRECTION OF PUBLIC WORKS

Wastewater, Stormwater & Flood Protection

EXECUTION OF URBAN INFRASTRUCTURE PRIORITY (VRD) OF THE INTEGRATED DEVELOPMENT AREAS OF PORT AU PRINCE, MARTISSANT AND BAILLERGEAU


Following the earthquake of January 12, 2010, the Government of Haiti (GOH) requested support fromFrench Agency for Development (AFD) afin d’exécuter des travaux d’exécution des infrastructures urbaines et d’aider à la reconstruction de la région métropolitaine. Cet appui devait s’inscrire dans la stratégie de reconstruction, telle que définie par le Gouvernement et les représentants de la communauté internationale, à savoir : sortir les populations sinistrées des camps dans lesquels elles s’étaient réfugiées, en créant les conditions de retour en toute sécurité dans leurs quartiers d’origine.
The Martissant Park sector, known as a "concerted development zone" (ZAC), was identified by CIAT as one of seven potential trigger projects. The neighborhood of Baillergeau has been selected as a second area of intervention for the execution of urban infrastructure, smaller in scale but with similar characteristics to some areas of the ZAC of Martissant.


PHASE I : STUDIES
Inception Report, Preliminary investment studies ; Topographic survey ; geotechnical survey
Social support studies
Population displacement Studies
Hydraulic and hydrological study
Technical studies of roads ; drainage and sewerage networks
Environmental and Social Management Plan
Sizing of structures (Gateway)
Elaboration of performance records and tender documents
PHASE II : ASSISTANCE TO BID EVALUATION AND SELECTION OF COMPANIES
PHASE III : CONTROL AND MONITORING OF WORKS