Avenue Kheireddine Pacha 1073 Mont Plaisir +(216) 70 029 920 contact@concept.com.tn

  • Home
  • Service ASSESSMENT OF CONDITIONS OF GUMA DAM, TRANSMISSION SYSTEM, RESERVOIRS AND TREATMENT PROCESS

Pour plus d'information

+(216) 70 029 920
+(216) 71 905 262
contact@concept.com.tn

  • Country Sierra Leone
  • Location: GUMA DAM
  • Duration of the mission: 6 months
  • Name of the Client : Millennium Challenge Coordinating Unit (MCCU)

Hydraulic development - water management and treatment

ASSESSMENT OF CONDITIONS OF GUMA DAM, TRANSMISSION SYSTEM, RESERVOIRS AND TREATMENT PROCESS


This project is designed to build the capacity of the company Guma Valley Water Company in the control of the water transmission system of the Guma dam and related works
L’assistance technique est conçue non seulement pour produire des évaluations et des cartes spécifiques générées par des consultants ; mais l’objectif est plutôt de renforcer les capacités du GVWC dans chaque domaine de travail. Cette affectation est la deuxième phase et comprend les éléments suivants :
• Réservoir et station de traitement d’eau de Guma Valley (GVWTP) :
• Évaluation de l’état de l’usine de traitement de GVWC, y compris la prise d’eau du réservoir et le pipeline de transport d’eau brute et évaluation des processus de traitement au GVWTP. Conditions de santé, de sécurité et d’environnement (HSE) de l’évaluation du barrage.
Conveyance networks with their interconnecting pipes and operation of the sluice system.
• Évaluation de l’état des conduites de transport d’eau en vrac, y compris les réservoirs de service, la station de pompage et les vannes critiques.


Activity 1: Development of the HSE plan detailing project initiation, start-up report and project management and health and safety plan.
Activity 2: Assessment of the condition of the Guma Dam, GVWTP, and the conveyance and reservoir system and evaluation of treatment processes at the GVWTP, including: Site surveys, Data collection, On-site examination and engineering assessment, including overall dam stability and confirmation of hydraulic capacity Preparation of the Preliminary Study for the complete evaluation which includes all of the above tasks with recommendations for improvement Assessment of the condition of the water conveyance pipes, and the raw water discharge pipes from Guma Dam to the treatment plant Draft and final report of the treatment and water quality processes and recommendations for its improvement and management
Activity 3: Implementation of a health and safety plan and procedure including: Health and safety training, Health and safety compliance monitoring and reporting provided in the HS monthly monitoring reports


Veuillez attendre le temps de chargement