CONCEPT finalized during the year 2020 the emblematic project of the " Diagnosis of the Guma Dam, of the Drinking Water Treatment Plant, Water Supply Systems and Water Reservoirs" in Freetown in Sierra Leone on behalf of MCC and GVWC. The project "EVALUATION OF THE CONDITIONS OF THE GUMA DAM: TRANSMISSION AND RESERVOIRS SYSTEM AND EVALUATION OF THE TREATMENT PROCESSES" consisted in making an in-depth physical diagnosis of the infrastructures and the evaluation of the hydraulic functioning and the process of this complex water system with a capacity of more than 35 Million m3/year (about 4000 m3/h) supplying drinking water to more than 3 Million inhabitants. Un système rigoureux d’Hygiène, Sécurité et Environnement (HSE) a accompagné la réalisation du projet.
December 2020- Sierra Leone: Diagnosis of the Guma Dam
CONCEPT finalized during the year 2020 the emblematic project of the " Diagnosis of the Guma Dam, of the Drinking Water Treatment Plant, Water Supply Systems and Water Reservoirs" in Freetown in Sierra Leone on behalf of MCC and GVWC.
The project "EVALUATION OF THE CONDITIONS OF THE GUMA DAM: TRANSMISSION AND RESERVOIRS SYSTEM AND EVALUATION OF THE TREATMENT PROCESSES" consisted in making an in-depth physical diagnosis of the infrastructures and the evaluation of the hydraulic functioning and the process of this complex water system with a capacity of more than 35 Million m3/year (about 4000 m3/h) supplying drinking water to more than 3 Million inhabitants.
Un système rigoureux d’Hygiène, Sécurité et Environnement (HSE) a accompagné la réalisation du projet.