Avenue Kheireddine Pacha 1073 Mont Plaisir +(216) 70 029 920 contact@concept.com.tn

Search
Tunisia 2 months 2021

Waste management and treatment |

REHABILITATION AND DEVELOPMENT OF THE CONTROLLED LANDFILL OF AGUAREB IN SFAX FOR ITS CLOSURE

ANGed has ended the operation of the controlled landfill of El Gonna in Agareb which has reached its design capacity. In fact, this landfill has been in operation since April 2008 and has been used since then for technical burial...

Tunisia 36 months 2021

Wastewater, Stormwater & Flood Protection |

ASSISTANCE, CONTROL AND FOLLOW-UP OF THE WORKS OF THE WASTEWATER TREATMENT PLANTS OF SUD MELIANE II

The project consists of a recalibration, a rehabilitation and an extension in "design & build" mode of the South Melian II WASTEWATER STATIONS as follows: - Abandonment of the WASTEWATER STATIONS I (all the works of the SMT) - Maintenance of the...

Tunisia 24 months 2021

Hydraulic development - water management and treatment |

CONTROL AND SUPERVISION OF THE WORKS FOR THE REHABILITATION OF THE CANAL OF LAROUSSIA

L'objet du marché que compte réaliser le CRDA par l'intermédiaire de l'Ingénieur-conseil est la réalisation du contrôle et surveillance des travaux rentrants dans le cadre de la réhabilitation du canal Laroussia branche nord sur un linéaire de Total de 14...

REPUBLIC OF CENTRAFRIC 9 months 2021

Drinking water supply and water resources management |

MISSION DE REALISATION DES SCHEMAS DIRECTEURS POUR LE DEVELOPPEMENT DES SERVICES D’EAU ET D’ELECTRICITE, ETUDES D'APS, ET D'APD, DANS 7 VILLES SECONDAIRES EN CENTRAFRIQUE

The objective of the mandate is to carry out the Master Plans for the development of water and electricity services, as well as the Summary Preliminary Project (APS) and Detailed Preliminary Project (APD) studies in the seven (7) secondary cities in the Central African Republic. Towns...

Niger 8 months 2021

Drinking water supply and water resources management | Wastewater, Stormwater & Flood Protection |

ETUDE DE FAISABILITE DU PROJET D’ALIMENTATION EN EAU POTABLE ET D’ASSAINISSEMENT DES VILLAGES IMPACTES DANS LE CADRE DE LA DEUXIEME VAGUE DU PAR DE LA ZONE DU RESERVOIR DU PROGRAMME KANDADJI, ELABORATION DES APD ET DES DAO PHASE 2 : CONTROLE ET SUPERVISION DES TRAVAUX

Dans le cadre du Programme P-KRESMIN, l’ABK se propose d’élaborer un projet pour l’alimentation en eau potable et l’assainissement des villages de la vague2 ainsi que la mise à niveau de l’alimentation en eau potable de la vague 1 et...

Tunisia 4 months 2021

Drinking water supply and water resources management |

PROGRAM FOR STRENGTHENING THE NORTHERN WATER TRANSFER INFRASTRUCTURE FOR THE REGIONS OF GREATER TUNIS, CAP BON, SAHEL AND SFAX STUDY ON THE DEVELOPMENT OF THE ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK

The requested services relate to the completion of the study to develop the Environmental and Social Management Framework (ESMF) for the program to strengthen the Eaux du Nord transfer infrastructure for the regions of Greater Tunis, Cap Bon, Sahel and...

Rwanda 8 months 2020

Drinking water supply and water resources management |

SELECTION OF CONSULTANT FOR CONSULTANCY SERVICES FOR THE FEASIBILITY STUDY FOR WATER SUPPLY IN VOLCANIC REGION IN RWANDA

Feasibility study for the rehabilitation and extension of existing infrastructure to strengthen the capacity of the system and promote measures to reduce the distance of access to the nearest water point to less than 500m in the Volcanoes region in...

Burkina Faso 6 months 2020

Drinking water supply and water resources management |

SUPPLY OF DRINKING WATER TO THE CITIES OF KAYA, BOUSSOUMA AND KORSIMORO FROM LAKE DEM

The project concerns the realization of the Study of a preliminary detailed project of reinforcement of the system of DWS of the city of Kaya as well as the study of a preliminary detailed project of AEP of the cities of Boussouma and Korsimoro from the lake Dem

Guinea 36 months 2020

Wastewater, Stormwater & Flood Protection |

DETAILED ENGINEERING DESIGN AND WORKS SUPERVISION OF CONAKRY SANITATION PROJECT

The Government of the Republic of Guinea anxious to improve the living environment of the people of Conakry. Fortified with a proven political will to implement a sustainable strategy for the management of solid, liquid waste and the

Sierra Leone 6 months 2020

Hydraulic development - water management and treatment |

ASSESSMENT OF CONDITIONS OF GUMA DAM, TRANSMISSION SYSTEM, RESERVOIRS AND TREATMENT PROCESS

This project is designed to build the capacity of the Guma Valley Water Company in the management of the Guma Dam water transmission system and related works; The technical assistance is designed not

Mauritania 7 months 2020

Waste management and treatment |

Master plan study, environmental and social impact Assessment and preparation of tender call for the solid waste management of Rosso

CONCEPT, together with ARTELIA and HYDROCONSEIL RIM, has been commissioned by the World Bank to carry out the following project: "ELABORATION OF THE MASTER PLAN FOR SOLID WASTE MANAGEMENT, ENVIRONMENTAL AND SOCIAL IMPACT STUDIES AND PREPARATION OF THE TENDERING DOCUMENTS FOR THE INFRASTRUCTURES TO BE CONSTRUCTED

Tunisia 9 months 2020

Hydraulic development - water management and treatment |

SUMMARY PRE-PROJECT STUDY OF A DAM ON OUED EL HAMMAM-DELEGATION OF ZRIBA GOVERNORATE OF ZAGHOUAN

The preliminary design study of a dam on the Oued el Hammam is part of the national strategy for the mobilization of surface water, and thus contributed to stimulate the regional development of the Governorate of Zaghouan. A preliminary study was carried out by J....

Burkina Faso 6 months 2020

Wastewater, Stormwater & Flood Protection |

RAINWATER DRAINAGE SCHEME IN 12 REGIONAL CAPITAL CITIES OF BURKINA FASO AND ENVIRONMENTAL AND SOCIAL ASSESSMENT, LOT 1 : BOBO-DIOULASSO ; BANFORA ; GAOUA

The study aims to analyze different alternatives at the scale of the development of the city as a whole in order to identify optimal drainage solutions that will minimize the negative impacts of rainwater runoff on people and

Tunisia 4 months 2020

Drinking water supply and water resources management |

STUDY FOR THE ELABORATION OF THE ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK (EMF) FOR THE REINFORCEMENT OF THE NORTHERN WATER TRANSFER INFRASTRUCTURES

The Design Office is required to provide the services requested knowing Environmental and Social Management (ESM) of the program the rules of the art and this in accordance with the indications and technical specifications.The services requested relate to the realization of the study of development of the...

Veuillez attendre le temps de chargement